
Multiple Tenant Buildouts, Fort Pierce, FL
Hurricane Irma flooded the Orange Blossom Business Center in Fort Pierce in 2017. TRM Construction Management was among the first on site after the storm passed. The team performed flood cuts throughout the mall to remove water-damaged drywall. TRM removed and replaced more than 400,000 square feet of drywall and more than 270,000 square feet of flooring.
TRM also helped several tenants rebuild their spaces, including the Supervisor of Elections, Convey Health, Lab Corp, Atlantic Court Recording, Jesus Center, and All Inclusive Therapy.